Recent Opportunities
Landscaping Services for Various PHA Sites
Date Added: May 21, 2013
Response Deadline: June 19, 2013
The Philadelphia Housing Authority (PHA) is soliciting proposals from interested in qualified painting contractor for all PHA conventional developments and scattered sites. A more detailed work statement is contained in the solicitation package
Date Added: May 20, 2013
Response Deadline: June 20, 2013
Interior build-out/conversion of existing 14 story historical office building (617 Vine St., Cincinnati, OH) to a 249 Room Hampton Inn & Homewood Suites hotels with a goal of LEED Silver. Misc. steel, millwork, insulation, caulking, doors, frames and hardware, interior glass, drywall, acoustical ceilings, painting, VWC labor, CPT labor, floor tile, VCT, toilet accessories, plumbing. SBE/MBE/WBE participation is encouraged and may be a factor utilized by JDL Warm Construction to select a successful bid. Any bidder which is not an SBE/MBE/WBE itself is encouraged to use SBE/MBE/WBE sub-subs and suppliers to the extent feasible. Bonds may be required, but certified SBE/MBE/WBE’s are encouraged to bid even if bonding is not available. Construction.
Date Added: May 20, 2013
Response Deadline: June 11, 2013
Sealed bids will be received by Dayton Public Schools (DPS) at the Treasurer’s Office, 115 S. Ludlow Street, Dayton OH 45402-1812, until 2:00 p.m. local time, on June 18, 2013, for the Wogaman 4-8 School Roof Replacement & Building Envelope Remediation Project in accordance with Contract Documents prepared by Mays Consulting & Evaluation Services (MCES). Bids will be opened and read immediately afterwards. A pre-bid meeting is scheduled for May 29, 2013, at 10:00 a.m. at the DPS Service Building, 4280 N. James H McGee Blvd. Dayton, OH 45417. Submit all Questions to Gary Mays by email (gmays@mces.com). This is a co-funded OSFC project. This notice is posted on the District’s website: www.dps.k12.oh.us under Bid Information.
Date Added: May 17, 2013
Response Deadline: June 18, 2013
PHA has determined that there is a need for the supply and delivery of floor tile to the warehouse. A more detailed statement of work is contained within the solicitation package
Date Added: May 17, 2013
Response Deadline: June 19, 2013
PHA has determined that there is a need for the supply and delivery of lumber products to central warehouse. A more detailed statement of work is contained within the solicitation package
Date Added: May 16, 2013
Response Deadline: June 17, 2013
PHA has determined that there is a need for the supply and delivery of janitorial products to the warehouse. A more detailed statement of work is contained within the solicitation package
Date Added: May 16, 2013
Response Deadline: June 18, 2013
The Philadelphia Housing Authority is seeking bids for the Supply and Delivery of Gas Ranges within the city of Philadelphia. A more detailed statement of work is detailed within the solicitation package.
Date Added: May 16, 2013
Response Deadline: June 14, 2013
Construct a pre-fabricated booster pump station, including foundation, meter pit, water main modifications, site grading, roadways and parking lots, electrical work, instrumentation, and demolition of existing pump station.
Date Added: May 14, 2013
Response Deadline: May 24, 2013
The Work includes modifications to the headworks, blower building, UV system, aeration basins, SCADA system, pump station and WWTP improvements, and a new engine generator.
Date Added: May 14, 2013
Response Deadline: May 23, 2013